SEAI Grant · Donegal (Tír Chonaill)

€2,100 off solar in Donegal.
Filed in 12 days.

We file your SEAI grant directly through Donegal County Council (County House), coordinate the BER with one of 41 assessors operating in Donegal, and have your €2,100 approved in 12 working days (vs. 10-day all-Ireland average).

€2,100
Maximum grant
12
Days to approve in Donegal
22
Donegal grants YTD
41
Donegal BER assessors
See Donegal solar →
Working with Donegal County Council

Donegal County Council
+ Solas Energy.

The Donegal planning landscape, the local BER assessor pool, and how we navigate both for every install.

Planning office

Donegal County Council

County House, The Diamond, Lifford, F93 Y622

For protected structures and Architectural Conservation Areas in Donegal, we submit Section 57 declarations directly to this office. Solar PV on standard owner-occupied homes is exempt from planning permission since SI 405/2022 — so most Donegal installs need zero council interaction.

View Donegal planning portal →
BER assessor pool

41 SEAI-approved assessors in Donegal

We pre-book assessor slots monthly across Donegal. $41 active assessors means $Donegal reassessments typically happen within 7-10 days of switch-on — vs. 3-4 weeks if you book independently. Assessor fee €150-€200 (often included in our fixed-price quote).

Public register: SEAI maintains the BER assessor directory at ndber.seai.ie — every name we coordinate with is on this list.

Donegal grant volume

22 grants filed YTD

22 successful SEAI grant applications filed by Solas Energy in Donegal year-to-date in 2026. Total Donegal grants we've completed since registration: 42. Approval rate: 98% (first-time, no rejections requiring resubmission).

Approval speed in Donegal

12 working days average

Slightly above the 10-day average due to Ulster batch processing schedules. We file at quote acceptance to compress the timeline. Total quote-to-payout timeline: 56-76 days for Donegal.

How the grant scales

€700 per kWp,
up to €2,100.

SEAI structures the grant by system size. Below: how it scales for typical Donegal installs based on local roof areas and consumption.

System size Typical Donegal install cost SEAI grant You pay
2 kWp · 5 panels €6,500 €1,400 €5,100
4 kWp · 10 panels (Longi) €9,800 €2,100 €7,700
5 kWp · 13 panels €11,200 €2,100 (cap) €9,100
6+ kWp · 15+ panels €12,500+ €2,100 (cap) €10,400+

Cost ranges include Longi Hi-MO 6 430W panels (our default for Donegal), hybrid inverter (12-day lead time), scaffolding (rental €215-€285), all electrical works, ESB notification, BER coordination, and grant filing. Battery storage is optional.

Eligibility · Donegal

Are you eligible
in Donegal?

The SEAI Solar Electricity Grant is open to most Donegal homeowners — 4 criteria. Tick them in 60 seconds:

If you checked all 4 — you qualify for the full €2,100.

SEAI grant approved solar install in Donegal
Donegal 22 grants YTD
Timeline · Donegal

From "I'm interested"
to €2,100 in your bank.

Donegal-specific timeline based on 12-day SEAI approval + 12-day inverter lead time. Total: 56-76 days from first enquiry.

01

Quote + survey

Our Donegal engineer surveys within 7 days. Confirms eligibility against Donegal County Council rules.

Day 0–7
02

SEAI application filed

Uploaded with system design + Eircode (any of: F92, F93, F94…) + Safe Electric installer ID.

Day 8
03

Grant offer issued

SEAI confirms €2,100 grant — 12-day Donegal avg processing time.

Day 20
04

Install in Donegal

Single-day install with Longi Hi-MO 6 430W. Best schedule month: June.

Day 25-35
05

BER reassessment

One of 41 Donegal-based assessors visits. We pre-book in monthly batches.

Day 40-50
06

Grant paid out

SEAI deposits €2,100 into your Irish bank account. We chase if delayed.

Day 67
SEAI Grant FAQ · Donegal

All the grant questions,
answered for Donegal.

Real questions from Donegal homeowners. Answers reference Donegal County Council, our local BER assessor pool, and the actual 12-day approval window we see for Donegal filings.

The SEAI Solar Electricity Grant pays up to €2,100 per home in Donegal (and the rest of Ireland). Structured as €700/kWp for the first 2 kWp installed, capped at €2,100. The grant amount is the same nationwide — what differs by county is the local process: in Donegal we file through Donegal County Council and coordinate with one of 41 SEAI-approved BER assessors operating in the area.
Donegal County Council's planning office is at County House, The Diamond, Lifford, F93 Y622. While solar PV on most Donegal homes is exempt from planning permission (SI 405/2022), we coordinate directly with this office for protected structures, ACA-located homes, and apartments. Their planning portal: https://www.donegalcoco.ie/services/planning/.
Our Donegal grants take 12 working days on average from filing to approval. Donegal is slightly above average due to Ulster batch processing schedules. We file at quote acceptance to compress the timeline. Total timeline from quote to grant payout is 56-76 days.
41 SEAI-approved BER assessors are active in Donegal per the SEAI public register. We pre-book assessor slots in batches each month, which means Donegal customers typically get their post-install BER reassessment within 7-10 days of switch-on — vs. 3-4 weeks if you book independently. Assessor fee (~€150-€200) is often included in our quote.
Unfortunately no — the SEAI Solar Electricity Grant is for owner-occupiers only. Landlords in Donegal can still install solar (Microgen Support Scheme tariff still applies, 0% VAT on solar PV materials since May 2023), but without the €2,100 grant payback stretches from 5-7 years to 8-10 years. For commercial/agricultural properties in Donegal, separate schemes apply (TAMS 3 for farms, SME grants up to €162,600).
New builds (post-31 Dec 2020) in Donegal are excluded from the SEAI residential grant — they're assumed to meet higher building energy standards already. You can still install solar — the Microgen Support Scheme tariff (~€0.21/kWh export) and 0% VAT apply. Donegal has a growing pool of post-2020 builds, especially in newer estates around Buncrana and Ballybofey — we flag eligibility at first contact.
Yes, Donegal homeowners can stack the Solar Electricity Grant with: SEAI EV Home Charger Grant (€300), Better Energy Home Scheme (insulation/heat pump grants up to €8,000+), and One-Stop-Shop service for whole-home retrofits. Plus 0% VAT on solar PV materials (since May 2023). All those stack on top of the €2,100 solar grant — same grant scheme works the same way in every county including Donegal.
For most Donegal homes: no. Donegal County Council planning permission is exempt for domestic rooftop solar PV (SI 405/2022). The exceptions in Donegal — protected structures (Section 57 declaration needed), Architectural Conservation Areas, apartments — we coordinate with Donegal's planning office at County House.

SEAI grant in nearby counties

Each county has its own planning office, BER assessor pool and processing time. Compare Donegal's 12-day approval with neighbours:

Apply now · Donegal

Don't leave €2,100
on the table.

Free quote, full SEAI grant filing through Donegal County Council, BER coordination with one of 41 Donegal assessors. 42 Donegal homes installed to date.

Donegal grant snapshot
12 days.
€2,100.
Filed by us.
Donegal County Council
Avg approval12 days
Donegal BER assessors41
YTD grants (Donegal)22
Total Donegal installs● 42